In
March, Point Lepreau produced about 45 per cent of the total net
generation from NB Power generating stations, putting about 660
megawatts on the grid.
An outage is scheduled to begin in early
May and last 45 days. It coincides with the anticipated increase in
hydro electricity from the spring melt on the St. John River.